GE TM2500

Mobile aero-derivative generation package — designed for rapid deployment and grid support.

TM2500
TM2500 - detail 1 TM2500 - detail 2

Overview

The TM2500 is an aero-derivative gas turbine in a mobile package, optimized for rapid deployment where temporary or emergency power is required. It offers quick start-up and compact transportable packaging.

Key Highlights

  • Mobile, packaged aero-derivative unit
  • Quick start and rapid deployment
  • Suitable for temporary power, peaking, and emergency support
  • Typical outputs vary by package and configuration

Key Highlights

  • Mobile, packaged aero-derivative unit — rapid deployment
  • Simple-cycle output up to approximately 33–37 MW depending on configuration
  • Simple-cycle efficiency roughly 35%–40% (LHV)
  • Cold start to full load in about 5 minutes
  • Fast install time (on the order of ~14 days for typical project scopes)
  • Proven fleet with hundreds of units installed worldwide

Reference Specifications

ParameterValue
Simple-cycle outputApprox. 33–37 MW
Simple-cycle efficiency (LHV)Approx. 35%–40%
Cold Start~5 min
Install Time~14 days (project dependent)
Frequency50 / 60 Hz
Fuel CapabilityNatural gas, liquid fuel, dual-fuel options

Published reference values — verify final configuration and performance with OEM documentation and project-specific engineering.